Monthly Outage Reports 

for Fiscal Year 2007

 

The following definitions act as a guide to understanding the utility's terminology used in the report.

Recloser = A circuit breaker that automatically "opens" or "closes" when is senses a problem on the line.  The circuit breaker will try to open and close three times before remaining closed if the problem has not cleared its self. Thus requiring a lineman to physically locate the problem within the line.

Fuse/Cutout = A piece of equipment containing a fuse and attached to a pole.  When current exceeds the fuse's load rating it will melt the fuse, and prevents the current to flow.  


(click on a calendar month to view the report for that month)

  Oct 2006  Nov 2006  Dec 2006  Jan 2007  Feb 2007  Mar 2007

 Apr 2007  May 2007  June 2007  July 2007  Aug 2007  Sept 2007

 

 

 